Sunday 27 July 2014

Mahamandi pre-event Publicity :- MahaMandi Flame

We all know Olympics game very well. Do you remember before starting Olympics London, 2012, the OLYMPIC FLAME???
The Olympic flame (Torch Relay), which was transported to every stadium where the games were hosted. The London Olympics inaugural ceremony was stated after the flame came in the stadium. Not only the Olympics the flame is now becoming a part of many events, where the fire is kept burning throughout the event.



            We organise MahaMandi and we do include other B- schools as well. We can transport “MAHAMANDI FLAME” to every possible management colleges. The proposed route is shown in video.



Starting Point: Nariman Point
End Point: NITIE

Total Distance: 45 KM (Approx)

Tuesday 22 July 2014

MahaMandi Poster: My first poster in life = Painting in Schools


I don't remember when did I tried painting after my schools. I remembered everything when my drawing teacher used to ask about new painting or sketch every week. I found poster making activity quite resembles to the school days paintings. Only thing I noticed is that I was not afraid of making poster this time. I so many tools and softwares are available to help people like me, those who have their Creative IQ close to zero.
It started with how should we make it, which software can help us but in the end i end up with lot many options. I found there are resources available, we just have to use those. People have already worked on those thing to make life simple. It has become more simple because of this digital world. This poster taught me about how should we deliver details about any event, which are the must things to be mentioned and so many.
By the way this is my first poster in my life, promoting a event called MAHAMANDI, a flagship event of National Institute of Industrial Technology (NITIE)

Monday 21 July 2014

3 men valley crossing exercise and learnings



Scenario:
There are three people trying to cross a valley. The gap of the valley is in the range of one to two feet.They have a rod of a convenient size and they have to cross the valley using the rod as a support. 


Assumptions : 
Each of them has the same footstep.
Direct jumping over the valley is not allowed.

Look at this you will get the idea:



 STEP BY STEP ANALYSIS OF WHOLE PROCESS:


                             Persons
First Person
Second Person
Third person
                Step
1
Safe
Safe
Safe
2
Half Risky,
3
Full Risky,
4
Half Risky,
Half Risky,
5
Full Risky,
6
Half Risky,
Half Risky,
7
Full Risky,
8
Half Risky,
9
Safe
Safe
Safe
  • ·         Initially, the first person puts his leg forward and hid first foot remains in air and so he is only half safe. The remaining are fully safe. 
  • ·         The next step, the first person is totally unsafe and he has hang from the rod, which is being supported by the other two with their weight. 
  • ·         The next step, the first person puts its first foot on the other side of the valley and hence half safe again. The second person now puts his first foot in air and hence even he is half safe. 
  • ·         At the end of next step, the first person totally reaches the other end of the valley and hence is totally safe again. The second person is totally unsafe hanging in the air with the support of the rod weighted by the first and third persons. 
  •  

  • ·         Next step, the second person puts his first step on the other side of the valley and the third person puts his first step in the air and hence both are half safe.
  • ·         At the end of next step, the third person reaches the other end of the valley and hence totally safe again. The third person remains hanging in the air supported by the first two persons who have reached the other end of the valley. 
  • ·         After two more steps, even the third person reaches the other end of the valley and the mission has been accomplished.

Lessons Learned:
Role Designing: 
In role designing manager has to think of specified roles for every team member.Roles which are connected one to the other is interlocked and the success of the whole task is dependent on this success of this concept. Here in this exercise, member roles for crossing the valley are interlocked. It is the ability of the management to think the roles in such  a way. 

 Watch how every player has a specific role in  a football match:




WORK PLANNING
It emphasizes the fact that staff clearly have a crucial understanding of the work that needs to be done, and how their individual or group effort contributes to the system.

  

 In Valley crossing process every member must know the instructions for them so that the assigned task can be completed without any confusion and hindrance.

Team work:
Valley crossing explicitly explains the concept of team work i.e. cooperation, coordination etc. The members have to match their steps, walk in tandem to achieve the desired result. If there had been slight deviation in the synchronization then it would have led to some hiccups.